

The work site is quiet as the contractor for our Green Envelope Project awaits the arrival of the final pieces to finish repairs to the spires. Meanwhile, members of the team made the climb to the top to retrieve the 250th and Pride flags. While there, they captured several great images AND determined that the height from the top matches the height of Weir Hill (seen in the distance). Amazing project, amazing progress, amazing view. Painting begins soon!

